![]() |

| STS-96 (Flight # 94) | 27 May - 6 June 1999 | Discovery (26) |
Crew:
Kent
V. Rominger [4], Commander
Rick
D. Husband [1], Pilot
Ellen
Ochoa [3], Mission Specialist
Tamara
E. Jernigan [5], Mission Specialist
Daniel
T. Barry [2], Mission Specialist
Julie
Payette [1], Mission Specialist (Canada/CSA)
Valery
Ivanovich Tokarev [1], Mission Specialist (Russia)
Launch:
Pad: 39-B (40)
Date: 27 May 1999
Time: 10:49:42 UTC
Orbit:
Altitude: 173 nm
Inclination: 51.6 degrees
Orbits: 154
Duration: 9 days, 19 hours, 13 minutes, 1 second
Distance: 3.8 million miles
Landing:
Location: Runway 15, Kennedy Space Center, FL (47)
Date: 6 June 1999
Time: 06:02:43 UTC
Rollout: 56 seconds (2,702 meters, 8,866 feet)
Highlights:
This second mission docked with the ISS and supplies were transferred.
Cranes for the ISS were installed, some repairs made, and the ISS prepared for future
habitation.
Space Station Assembly Flight 2A.1
| Mission Poster | Crew Poster |