WSF logo

STS-104

STS-104 [Flight # 105]12-25 July 2001Atlantis [24]

Crew:
    Steven Lindsey [3], Commander
    Charles Hobaugh [1], Pilot
    Michael Gernhardt [4], Mission Specialist
    James Reilly [2], Mission Specialist
    Janet Kavandi [3], Mission Specialist

Launch:
    Pad: 39-B [47]
    Date: 12 July 2001
    Time: 09:03:59 UTC

Orbit:
    Altitude: 240 nm
    Inclination: 51.6 degrees
    Orbits: 216
    Duration: 12 days, 18 hours, 34 minutes, 56 seconds
    Distance: 5,300,000 miles

ISS Docking: PMA-2 on Destiny, 14 July 2001, 03:08 UTC - 22 July 2001, 04:54 UTC

Landing:
    Location: Runway 15, Kennedy Space Center, FL [55]
    Date: 25 July 2001
    Time: 03:38:55 UTC
    Rollout: 1 minute, 41 seconds (3,310 meters, 10,858 feet)

Mission EVA's:
     1) On 15 July 2001 for 5 hours, 59 minutes
     2) On 18 July 2001 for 6 hours, 29 minutes
     3) On 21 July 2001 for 4 hours, 2 minutes
EVA's were performed by the following individuals:
    Michael Gernhardt
    James Reilly

Highlights:
    10th Space Station Assembly Flight 7A. Three spacewalks totaling 16.5 hours were performed for the installation of the joint airlock assembly.

sts104mission.jpg (109392 bytes) sts104crew.jpg (133323 bytes)
Mission Poster Crew Poster

 


Page last modified: 16 August 2015 18:43:48.