Crew:
Kenneth Cockrell [5], Commander
Paul Lockhart [1], Pilot
Franklin Chang-Diaz [7], Mission Specialist
Philippe Perrin [1], Mission Specialist (France)
ISS Upload:
Valeri Korzun [2] (Russia)
Peggy Whitson [1]
Sergei Treschev [1] (Russia)
ISS Download:
Yuri Onufrienko (STS-108)
Carl Walz (STS-108)
Daniel Bursch (STS-108)
Launch:
Pad: 39-A [61]
Date: 5 June 2002
Time: 21:22:49 UTC
Orbit:
Altitude: 122 nm
Inclination: 51.6 degrees
Orbits: 217
Duration: 13 days, 20 hours, 34 minutes, 52 seconds
Distance: 5,780,000 miles
ISS Docking: PMA-2 on Destiny, 7 June 2002, 16:25 UTC - 15 June 2002, 14:32 UTC
Landing:
Location: Runway 22, Edwards Air Force Base, CA [49]
Date: 19 June 2002
Time: 17:57:41 UTC
Rollout: 1 minute, 4 seconds
Mission EVA's:
1) On 9 June 2002 for 7 hours, 14 minutes
2) On 11 June 2002 for 5 hours, 0 minutes
3) On 13 June 2002 for 7 hours, 17 minutes
EVA's were performed by the following individuals:
Franklin Chang-Diaz
Philippe Perrin
Highlights:
14th Space Station Assembly
Flight UF-2. The Leonardo
cargo module was attached. Three EVA's totalling 19 hours, 31 minutes were performed to install the
Mobile Base System and make repairs to the Canadarm2.
Mission Poster | Crew | Crew Poster |
Archived NASA mission page for STS-111
Page last modified: 08 April 2024 16:04:16.